Anson Engine Museum

Anson Engine Museum Gallery


A.jpg
Next stage of the dismantling process3812 viewsTaken at the college w/c 2 Oct 2006.

Photograph courtesy of Maurice Clyde
arrive 1.JPG
Second lot of parts arrive at museum3384 viewsThese arrived at museum 11 October 2006
arrive 2.JPG
Second lot of parts arrive at museum5011 viewsThese arrived at museum 11 October 2006
arrive3.JPG
Second lot of parts arrive at museum3348 viewsThese arrived at museum 11 October 2006
arrive4.JPG
Second lot of parts arrive at museum5676 viewsThese arrived at museum 11 October 2006
arrive5.JPG
Second lot of parts arrive at museum3828 viewsThese arrived at museum 11 October 2006
arrive6.JPG
Second lot of parts arrive at museum3184 viewsThese arrived at museum 11 October 2006
B.jpg
Next stage of the dismantling process3614 viewsTaken at the college w/c 2 Oct 2006.

Photograph courtesy of Maurice Clyde
Dox Engineers.jpg
Engineers at college5044 viewsThe engineers at the college when the engine was installed in Oct 1967.
Photograph courtesy of Maurice Clyde
Doxford Fit Crank 2.jpg
Crank being fitted4879 viewsWhen the engine was installed at the Marine College in Oct 1967, crank being fitted.
Photograph courtesy of MauriceClyde
DSCF0001~0.JPG
First load of Doxford engine parts arrive at museum3778 viewsPhotograph taken by Geoff Challinor of first load of parts arriving 3 October 2006. Load consists of the top section of the scavenge pump, top piston and cross head assembly and various smaller parts.
DSCF0002_renamed_14789.jpg
The next load arrives on a glorious sunny day3427 viewsCrank shaft and water brake - each weighing 17 tons
42 files on 4 page(s) 1